' + BRAND_SUB_HTML + '
3665 West 2700 South, Cedar City UT 84720
(435) 340·1171  |  sales@zipkithomes.com
Homes Buildings

Configure shell kit quote

Optional — type a custom per-unit window package price if the customer is going non-standard (e.g. upgraded sizes, mixed brands, designer specs). Leave blank to use the standard price for the selected package.

Enter the miles to the job site — the per-mile rate is set by the model.

Optional — type a flat per-unit shipping cost if you got a quote from the office that doesn't match the per-mile math.

0%

Optional — type a custom amount (or 0 to waive) to discount or upcharge the design retainer for this customer.

For anything not in the standard kit — garage, patio, deck, extra room, basement, premium upgrades, etc. Each line flows into the total, proposal, contract, and payment schedule. Use a negative amount for a credit.

Heads up: the design fee and engineering are quoted per project — standard design retainer is $2,500 (override above to discount or upcharge). The shell kit does not include foundation, mechanical/electrical/plumbing, or interior finishing — make sure the customer knows that. Prices can change, so confirm before you commit anything in writing.

Quote summary

Total project price$0

Configure modular quote

Optional — fill in if the negotiated unit price differs from the default. Snow, windows, addons, shipping, and discounts all apply on top of this number.

Optional — type a custom per-unit upgrade price if the customer is going non-standard.

Optional — type a flat per-unit shipping cost if the office quoted a different number.

0%

For project extras or credits — site survey, premium appliances, no-fireplace credit, etc. Use a negative amount for a credit (e.g. -1400). Each line flows into the total, proposal, contract, and payment schedule.

Quote summary

Total project price$0

Configure garage quote

Enter the miles to the job site. The rate depends on standalone vs. bundled above.

Optional — type a flat per-unit shipping cost if the office quoted a different number.

Optional — type a custom amount (or 0 to waive) to discount or upcharge the design & engineering fee.

For garage doors, windows, snow-load engineering, or any extras. Each line flows into the total, proposal, and payment schedule. Use a negative amount for a credit.

A few things to tell the customer: snow load can add engineering and material cost (not figured here), and windows and doors aren't included in the garage shell price. Sales tax is added at invoice.

Quote summary

Total project price$0

Configure airplane hangar quote

Optional — fill in if the negotiated price differs from the starting price. Shipping and add-ons apply on top.

Enter the miles to the job site. Hangar shipping is $12/mile.

Optional — type a flat per-unit shipping cost if the office quoted a different number.

0%

Optional — type a custom amount (or 0 to waive) to discount or upcharge the design retainer.

For hangar doors, windows, snow-load engineering, insulation, lighting, anything not in the base kit. Each line flows into the total, proposal, and payment schedule. Use a negative amount for a credit.

Heads up: hangar shells are "starting at" pricing. Snow load, custom door packages, special finishes, and aviation-specific items (lighting, fire suppression, etc.) typically add to the base. Sales tax is added at invoice.

Quote summary

Total project price$0

Configure light-gauge steel frame quote

Free-form pricing — fill in what you've negotiated for the project. Pricing structure and scope will firm up over time.

Display only — doesn't affect the calculated total.

Negotiated price for the light-gauge steel frame package. Design and engineering are billed separately.

Quoted per project. Steel framing typically requires stamped engineering.

Default $14/mi. Adjust as needed.

Each line becomes a bullet on the proposal's "What's included" list.

Optional — type a custom amount (or 0 to waive) to discount or upcharge the design retainer.

For extras not covered in the base steel package — premium connectors, custom fabrication, etc. Use a negative amount for a credit.

Heads up: steel framing has a $2,500 design retainer up front. Engineering is quoted per project — get a real number from the engineering team before sending. Pricing structure for steel is still being firmed up — confirm everything with Sven before this goes to a customer.

Quote summary

Total project price$0

Configure custom home quote

Display only — doesn't affect the calculated total.

The negotiated construction price. Design and engineering are billed separately on top of this.

Pick the right tier for this project. Use the override below to discount or upcharge from the tier amount.

Optional — type a custom amount (or 0 to waive) to discount or upcharge the design retainer for this customer.

Quoted per project based on sqft, snow load, and seismic zone.

Default $18/mi. Adjust as needed.

Each line becomes a bullet on the proposal's "What's included" list.

For anything not in the negotiated build cost above — basement windows, dormers, premium upgrades, change-order work, etc. Each line flows into the total, proposal, contract, and payment schedule. Use a negative amount for a credit.

Leave empty to use the standard flow (Engineering is a fixed $, then 45/45/10 of the contract). Only fill this in when you want a different split — e.g. 6 payments instead of 3. Engineering stays as its own fixed-$ line either way; these percentages apply to the contract portion only and must total 100%.

Sum: 0%
Heads up: design retainer is paid up front — pick the right tier above ($2,500 Standard or $3,500 Custom). Engineering is quoted per project — get a real number from the engineering team before sending. Confirm everything with Sven before this goes to a customer.

Quote summary

Total project price$0

Your contact info (sales rep)

Used on proposals and invoices. Fill in once — saved on this browser.

Send proposal · customer-facing estimate

Configure a quote above, fill in the buyer details, then generate.

Opens in a new tab — print or save as PDF to email the customer.

Invoices · billing schedule

Special invoice · free-form / case-by-case

For one-off billing situations that don't fit the standard schedule above — e.g. drafting on a big multi-unit project, change-order work, partial credits. Pick a brand, fill in line items, generate.

Each line: description + amount. Use a negative amount for a credit (e.g. -500).

Total: $0